Oneject

Component Qualification Monitoring

35
Total Qualification
19
Menunggu Submit/Result
6
Perlu Trial Ulang
7
Sedang Berjalan
3
Completed
Alur Qualification Klik gambar untuk memperbesar
Alur Qualification
No. QualificationComponentProject NameTypePIC Lead StatusTahap TerakhirResultSubmit TerakhirFiles
QUAL-26-012 Cap 44mm HRT (Cap 44mm HRT-A New Ribs (Modifikasi Full Cavity)) Mold Modification Randi Waiting Partial Trial - 10-Aug-26
QUAL-26-008 Cap Safety F5+ Ukuran 1,5" Cap Safety F5+ Ukuran 1,5 Inch Trial 9 Settingan Low - High) New Mold Randi Waiting Trial 8 Settingan - 01-Aug-26
QUAL-26-011 Cap 44mm HRT Cap 44mm HRT-48 New Ribs (Full Cavity) Mold Modification Randi On Going OQ OK 10-Sep-26
QUAL-26-010 Cap 55mm (Cap 55mm HRT New Modif ( Cav. 7, 8, 9, 10) Vendor HRT Mold Modification Randi On Going Partial Trial OK 10-Aug-26
QUAL-26-028 Plunger DS 20ml HRT Trial PLUNGER DS 20ML HRT 16 Cavity, Material SCG New Mold Randi On Going Trial 8 Settingan OK 20-Aug-26
QUAL-26-024 Plunger 10ml DS HRT Plunger 10ml DS HRT New Disign Modift All Cavity Material Trilene New Mold Randi On Going Trial 8 Settingan OK 26-Aug-26
QUAL-26-019 Tube Mold 16*100 Cap Tube BCT 16mm New Mold Randi On Going Trial 8 Settingan OK 03-Jul-26
QUAL-26-002 Medline Tip Cap Trial Tip Cap Medline New Mold New Mold Tosan On Going Trial 8 Settingan (#3) OK 30-Jun-26
QUAL-26-007 Urine Liq Container lid Urine Container PE Berpu New Mold Antoni On Going Trial 8 Settingan OK 01-Jul-26
QUAL-26-033 Plunger - DS 3ml Trial Plunger DS 3ml HRT, Material PP Lotte J-560S New Material Source Antoni Open - - - -
Menampilkan 10 dari 35 qualification.